CPUC GO 95 fire-threat map, as republished in SCE's DRPEP hub. Drives work rules, permitting and crew cost.
Minimum remaining capacity. Substations are the phasing unit for a rollout.
Every filter above runs client-side against attributes baked into the tiles. No database is online behind this map.
Circuits draw as a generalised overview below zoom 10 and at full detail above it. The overview is a locator carrying 40% of route km — never measure from it.